Challenges
-
During the SAP S/4HANA implementation design phase, a key gap was identified.
- Zoetis lacked a global standard template for recipe and resource maintenance.
- This resulted in inconsistent recipe structures across different manufacturing sites.
- Master data setups varied both between sites and within individual locations.